AddThis Social Bookmark Button
Stephen Dmuchowsky ( Available )
Babylon, New York - 11702 USA
Expertise :Datacenter Facilities Manager, Datacenter Critical Systems Engineer, Building Manager
Status :Citizen
Job Type :
Permanent
Position :Architecture and Engineering

Resume
 
Summary




Engineer with combined 10 years of professional experience managing facilities and support services for the New York Stock Exchange and South Nassau Communities Hospital backed by Facilities Engineering and Construction Management Degrees with ongoing study at Building
Owners and Managers Institute to earn a Facilities Management Administrator designation.



Achievements

Coordinated and conducted Life Safety Program Implementation and Training .
Maintained and monitored all technology infrastructures and specialized hospital equipment to provide stable and dependable patient care services .
Acted as liaison between Facilities Engineering and Design , Development and Construction
Departments .
Served as coordinator for hospital renovation and expansion projects , the construction of buildings , parking and facilities .

Improved Life Safety Systems through use of new technologies , replacement of fire and alarm systems .
Implemented programs to achieve Accreditation with Commendation from the Joint

Commission of Accreditation of Healthcare Organizations JCAHO .
Increased hospital market share as member of Design , Development and Construction Team .
Constructed infrastructure to accommodate Wound Care and Mental Health Care programs .
EDUCATION and CAREER DEVELOPMENT
Building Owners and Managers Institute member
Facility Management Administrator Designation
SUNY
Maritime College , Bronx , NY
Bachelor of Science Facilities Engineering
New York University , New York , NY
Degree Program Construction Management
SOFTWARE/HARDWARE
GE Fanuc PLC and Cimplicity Software
Cutler Hammer Advantage Controls
Dranetz BMI Signature Series System
Raritan KVM Equipment
MTL Controls
Datatrax Systems Controls
Iconics Genesis32 HMI and SCADA Modular Automation Software


Employment

October, 2004 -  Present
Senior Engineer



October, 2000 -  October, 2004
Engineer

System Manager of 2200 - ton cooling tower plant providing condenser water for direct expansion air conditioners cooling 54340 - feet of raised computer floor environment
Assistant System Manager of the Facility Monitoring System FMS consisting of broad range of SCADA and information management products.
Supervise team of vendors and tradesmen ; oversee consultants
Implement process and operating strategy changes ; design enhancements to improve system reliability, increase productivity and reduce expenses.
Maintain and monitor technology infrastructures, HVAC, electrical distribution, uninterruptible power and mechanical systems.
Manage data center computer equipment to provide stable and dependable services for both the
New York and American Stock Exchanges.
Unite team members to solve operations/maintenance anomalies and autonomously resolve team conflicts that may arise.

Increased mechanical plant availability by implementing Programmable Logic Controller
PLC upgrade to Hot Standby Topology.
Achieved a more resilient Mechanical Plant to meet company business contingency planning requirements by means of system chemical treatment control upgrades and Outside Air Intake
OAI automation.
Attained energy cost savings from design and implementation of control upgrades to change mechanical plant s operating system.

Reduced troubleshooting time for increasing range of System Anomalies through use of new technologies and development of additional Facility Monitoring System FMS capabilities.
Managed capital improvement projects in schedule and cost constraints.
Scripted and conducted : comprehensive non-destructive Uninterruptible Power
System UPS Performance Test to recertify system capabilities ; acceptance testing for Programmable Logic Controller PLC Hot Standby configuration upgrade ; functionality test of PLC-based 7000 kW/17 Automatic Transfer Switch ATS emergency electric generation plant.
Managed all aspects, financial/project management of UPS capacitor replacement, while maintaining 100 percent availability of conditioned power to data center.


April, 1998 -  October, 2000
Engineer