AddThis Social Bookmark Button
Jaime Raab ( Available )
Dolan Springs, AZ - 86441 USA
Expertise :Engineering, Drafting, CAD
Status :Citizen
Job Type :
All -
Position :

Resume
 
Summary





I HAVE WORKED THROUGH OUT THE US FOR MANY DIFFERENT COMPANIES AND HAVE THE
PRIVILEGE OF OBTAINING A VARIETY OF KNOWLEDGE AND SKILLS FROM EACH WORKED.
GIVEN THE OPPERTUNITY I WOULD LIKE TO OFFER MY SERVICES OFF-SITE HERE AT MY HOME OFFICE USING THE LATEST CAD SYSTEM TO FACILITATE THE ENGINEERING and DOCUMENTATION OF YOUR PROJECT.
AS THE PROJECT DICTATES I CAN WORK AT THE MANUFACTURING SITE and YOUR FACILITY WHEN REQUIRED.
I BELIEVE THE TWENTY-FIVE YEARS OF EXPERIENCE is AN ASSET TO MY NEXT
EMPLOYER.
PRIMARY STRUCTURES DESIGN, SECONDARY STRUCTURES DESIGN, VIP INTERIOR DESIGN, SYSTEMS DESIGN,
CABLE/WIRE ROUTING, AVIONIC AND EQUIPMENT INSTALLATION EXPERIENCE.
KNOWLEDGE OF AIRCRAFT : BOEING, AIRBUS, HAWKER, BOMBARDIER/LEAR JET AIRCRAFT.
EXPERIENCED WITH AUTO CAD V. 2009 AND EARLIER DESIGN AND DRAFTING SYSTEMS
KNOWLEDGE OF MIL-STDS, ANSI-Y14.5 ANSI-Y14.15
SHEET METAL, CASTINGS, TUBING, PLASTICS, COMPOSITE MATERIAL'S.



Employment

2008 -  January, 2009

BAY SYSTEMS TECHNOLOGIES ACCOMAC , VA .

CONTRACTED

OFF-SITE... WORK PERFORMED AT MY HOME OFFICE FOR THE INTERIORS
ENGINEERING GROUP ON PROJECT 8143 A BOEING 777 200 VIP INTERIOR PROJECT.

RESPONSIBLE FOR DRAWING PACKAGES OF DESIGNATED AREAS OF THE AIRCRAFT like MASTER STATE ROOM, MASTER OFFICE, MASTER BEDROOM, FIRST CLASS PASSENGER, CREW LOUNGE, ALL DRAWING PACKAGES INCLUDED BULKHEAD/DECO AND CABINETRY COMPONENTS WITH DIVAN/TABLE/CHAIR ASSY/INSTL'S AS REQUIRED. DRAWINGS ENGINEERED PER ACFT SPECIFICATION OF WORK DOCUMENT, MASTER PLAN VIEW AND ELEVATIONS, ALL CORRESPONDENCE VIA EMAIL/PHONE/SKYPE INSTANT MESSAGING.


February, 2008 -  JULY, 2008

GORE DESIGN SAN ANTONIO TX .

CONTRACTED TO THE INTERIOR DESIGN GROUP, MY ASSIGNMENT WAS TO DESIGN AND DRAW
ELEVATIONS OF V.I.P. INTERIORS THAT INCLUDED COMPLETION OF PRELIMINARY DRAWING PACKAGES TO MEET PDR and CDR DEAD LINES.

WORK PERFORMED ON BOEING'S 737 800 AND AIRBUS A340 AIRCRAFTS.


August, 2006 -  MAY, 2007

DE CRANE AIRCRAFT GEORGETOWN , DE .

ASSIGNED TO BOEING
757 200 PROJECT, MODIFIED EXISTING FLOOR BEAM AND FWD/AFT
CARGO AREA PRIMARY STRUCTURE TO CARRY 6 300 GAL FUEL CELLS, IN ADDITION
REWORKED EXISTING STRUCTURES FOR FAA COMPLIANCE.


2005 -  JUNE, 2006

LANDMARK/ASSOCIATED AIR CENTER DALLAS TEXAS

CONTRACTED TO THE MECHANICAL ENGINEERING DEPT. ASSIGNED TO WORK ON
BOEING 737 700 AIRCRAFT WERE I WAS RESPONSIBLE FOR COMPLETE ASSEMBLY AND
INSTALLATION DRAWINGS OF INTERIOR COMPONENTS like : DADO PANEL, SIDE LEDGE CABINETS, ENTERTAINMENT CABINETS, GALLEY, LAVATORIES... VANITY. TOILET
SHOWER INSTALLS, WORKED PROJECT UNTIL COMPLETED. RE-ASSIGN TO AIRBUS A319
ACFT W/DIFFERENT INTERIOR PACKAGES THAT INCLUDED ENTERTAINMENT EQUIPMENT
INSTALLS, OVERHEAD EQUIPMENT PANELS, SEAT TRACK, SEAT INSTALL, DIVAN INSTALL
HEADLINER COMPONENT INSTALL, AVIONICS EQUIPMENT INSTALL/ EQUIPMENT BAY
RACK, MISC CABINET AND CLOSET ASSEMBLIES AND INSTALLS. RESPONSIBLE FOR LIAISON
ON CABINET/EQUIPMENT ASSEMBLIES DESIGNED UNTIL INSTALLATION COMPLETED IN
AIRCRAFT.


January, 2004 -  MARCH, 2005

DE CRANE AIRCRAFT PATS AIRCRAFT GEORGETOWN , DE .

CONTRACTED TO THE BBJ SERVICE CENTER BOEING
737 AIRCRAFT MODIFICATION
AND REPAIR STATION, ASSIGNED TO YG011 PROJECT, A PARTIAL INTERIOR
RECONFIGURATION ON BOEING 737 800 ACFT, REWORKED ALL SIDE LEDGES PANELS, G1 GALLEY, VIP LAVITORY, MONITOR AND SHROUD, MODIFIED/REPLACED EXISTING STRUCTURE TO FACILITATE INSTALLATIONS.


November, 2003 -  September, 2004

BOMBARDIER/LEAR JET TUCSON , AZ .

CONTRACTED TO THE COMPLETIONS ENGINEERING GROUP, ASSIGNED TO THE
CHALLENGER 60 PROGRAM. MY JOB RESPONSIBILITIES INCLUDED SEAT TRACK AND FLOOR STRUCTURE INSTALLATIONS, BULKHEAD WITH UPPER/LOWER STRUCTURE ATTACHMENTS, WARDROBE CABINETS
FWD AND AFT GALLEY INSTALLATIONS, DIVAN, TABLE, DADO PANEL, SIDE PANEL, P.S.U. AND SIDE LEDGE INSTALLS.


2003 -  November, 2003

ASSOCIATED AIR CENTER DALLAS TX .

CONTRACTED TO THE INTERIOR DESIGN GROUP, MY ASSIGNMENT WAS TO ASSISTED IN
THE COMPLETION OF PRELIMINARY DRAWING PACKAGES TO MEET PDR and CDR DEAD
LINES THAT WHERE PERFORMED ON BOEING'S 737 800 AND 747 400 AIRCRAFTS.


January, 2002 -  February, 2003

COMPLETION AIR ALTON IL .

CONTRACTED TO THE SYSTEMS GROUP... WORKED ON THE BOEING
767 AIRCRAFT
PROGRAM. JOB RESPONSIBILITIES WAS TO PREPARE DOCUMENTATION like DRAWING LIST, INSTALLATION DRAWINGS, VENDOR DATA, BOEING 767 STRUCTURE/SYSTEMS
INFORMATION. RESEARCHED AND PROVIDED CAD DRAWINGS REQUIRED REMOVING A COMMERCIAL TYPE INTERIOR AND REPLACING WITH A CUSTOM VIP INTERIOR FOR A MIDDLE EASTERN CLIENT.


October, 2000 -  November, 2002

OZARK AIRCRAFT SYSTEMS OAS BENTON VILLE AR .

CONTRACTED TO THE INTERIORS GROUP...
RE-CONFIGURED THE INTERIOR OF A BAE
737 200 AIRCRAFT PROJECT KNOWN AS C.A.V.S., PROJECTS INCLUDED G1, G3 GALLEY INSTALLS, AFT CABINET, LAVATORY AND HALLWAY CEILING PANEL MODIFICATIONS, FLOOR PALLETS FOR TABLES AND SEATING ARRANGEMENTS UNTIL AIRCRAFT COMPLETION. REASSIGNED TO NEW PROJECT BAE 737 700 AIRCRAFT PROJECT KNOWN AS BBJ-ONE WHERE I ASSISTED IN THE PRELIMINARY DESIGN OF INTERIOR COMPONENTS UNTIL DESIGN FREEZE. ASSIGNED TO ENGINEER FWD MASTER LAVATORY THAT INCLUDED ALL CABINETS, VANITY, TOILET SHROUD with TOILET INSTALLATIONS
LIGHTED MIRROR ASSEMBLIES, SIDE LEDGE WITH FULL HEIGHT CLOSET ASSEMBLY
BULKHEADS AND SIDE LEDGE CABINET ASSEMBLIES, EACH ASSEMBLY ACCOMPANIED BY
INSTALLATION DRAWING, WORKED ON PROJECT UNTIL AIRCRAFT COMPLETION.


March, 2000 -  August, 2000

OZARK AIRCRAFT SYSTEMS OAS BENTON VILLE AR .

CONTRACTED TO THE MECHANICAL ENGINEERING GROUP... MODIFIED A BOEING
737 ON
PROJECT I.S.P.A. DESIGNED AND INSTALLED ALL BULKHEAD ASSEMBLIES, DECORATIVE FINISH PANELS, DOOR ASSEMBLIES, MONITOR INSTALLATION, SWITCH
AND LIGHTING INSTALLS, DESIGNED FULL LENGTH SIDE LEDGE CABINET ASSEMBLIES.
STRUCTURAL ATTACHMENTS TO AIRCRAFT. ASSIGNED TO
AIRCRAFT OAK III RECONFIGURATION WHERE I DESIGNED AND DOCUMENTED PLUG-IN
TABLE UNITS INTO EXISTING DIVANS, MODIFIED EXISTING CABINETS, ADDED MONITOR, UPDATED ENTERTAINMENT COMPONENTS AND CABINET PER CUSTOMERS
RECONFIGURATION REQUEST LIST.


March, 1999 -  April, 

RAYTHEON E-SYSTEMS WACO , TX

DESIGNED AND DOCUMENTED INTERIOR COMPONENTS
like PARTITIONS, DOOR
ASSY/INSTALLS, CABINETS, BAE SIDE PANEL MODIFICATIONS FOR BAE 737 700
RE-ASSIGNED TO BAE 777 PROJECT WHERE ASSIGNED TO DESIGNED THE AFT VIP LAVATORY
WITH : SURROUNDING BULKHEADS, CLOSET, VANITY, TOILET SHROUD, TOILET AND SHOWER
INSTALLATIONS. INSTALLED AFT L/H AIR STAIR ASSEMBLY THAT INCLUDED FLOOR
TRACKING AND STOWAGE COMPARTMENT. INSTALLED MID GALLEY AND ADJACENT
CLOSET ASSEMBLY. ALL DRAWINGS, PARTS LIST, DETAIL'S AND INSTALLATIONS.


August, 1997 -  March, 1999

RAYTHEON CORPORATE JETS no ROCK , AR .

DESIGNED AND DOCUMENTED COMPLETE PRODUCTION DRAWING PACKAGES CONSISTING
OF SIDE PANEL, HEADLINER ASSEMBLY AND INSTALLATION, BULKHEAD, CLOSET UNITS
ENTERTAINMENT SYSTEMS, GALLEY ASSEMBLIES AND INSTALLATIONS, AFT LAVATORY WITH ASSOCIATED PLUMBING, AFT EQUIPMENT RACK, AVIONICS INSTALL IN AFT

EQUIPMENT BAY. ALL WORK PERFORMED ON THE HAWKER 800 AIRCRAFT.


October, 1996 -  MAY, 1997

LEAR JET INCORPORATED WICHITA , KS .

MY JOB RESPONSIBILITY TO DESIGN AND DRAFT THE FOLLOWING INTERIOR COMPONENTS : SIDEWALL PANEL, HEADLINER PANEL, CONVENIENCE PANEL PSU, DOOR AND EMERGENCY
HATCH PANELS, ALL TOOLING DRAWINGS REQUIRED FOR NORDAM PANEL FABERCATION.
DESIGNED CONVENIENCE PANEL HINGING AND LATCHING MACHINIST FOR EASE OF
INSTALLATION AND SERVICEABILITY. ALL DRAWINGS CREATED FOR LEAR JETS MODEL 60
SERIES NEW INTERIOR PACKAGE.


January, 1994 -  September, 1996

RAYTHEON CORPORATE JETS no ROCK , AR .

DESIGNED AND DOCUMENTED PRODUCTION DRAWINGS CONSISTING OF SIDE PANEL, HEADLINER ASSEMBLY, BULKHEADS, CLOSETS FORWARD AND AFT, GALLEY ASSEMBLIES AND INSTALLATIONS, AFT LAVATORY WITH VANITY SINK AND TOILET INSTALLATIONS

WITH ASSOCIATED PLUMBING, DESIGN AND INSTALLED AVIONICS EQUIPMENT RACKS, INVERTER RACKS AND INSTRUMENT PANEL MODIFICATIONS. ALL WORK PERFORMED ON THE
HAWKER 800 AIRCRAFT.

August 93 - October 93 HUNTING AIRCRAFT CO., PEACHTREE CITY, GA.


2031 -  2012

2 COMMERCIAL JET STREAM


August, 1991 -  JULY, 1993

ARKANSAS AEROSPACE no ROCK , AR .

SENIOR
DESIGNER/LIAISON - DESIGNED AND DRAFTED COMPLETE PRODUCTION
DRAWING PACKAGES CONSISTING OF HEADLINER ASSEMBLY, BULKHEADS, GALLEY, CABINET
UNITS, AFT LAVATORY, VANITY AND TOILET ASSY/INSTALLS WITH ALL

ASSOCIATED PLUMBING. WORKED ON ECU SYSTEM, MODIFIED EXISTING AIRCRAFT STRUCTURE TO FACILIATE INTERIOR COMPONENTS INSTALLATION. PACKAGES INCLUDED DETAILED DRAWINGS AND PARTS LIST. ALL WORK PERFORMED ON THE NEW BRITISH AEROSPACE BAE1000 SERIES AIRCRAFT.


June, 1989 -  June, 1991

CHRYSLER TECHNICAL AIRBORNE SERVICES CTAS

STRUCTURAL INTERIORS DESIGNER ASSIGN TO JVIP PROGRAM WORKING SECONDARY STRUCTURES IN THE INTERIOR GROUP, DESIGNED AND DETAILED PARTITIONS, SLIDING AND HINGED DOOR ASSEMBLIES, FULL HEIGHT CABINET AND OVERHEAD STOWAGE BIN ASSEMBLIES, DRESSING CHAMBER, LITTER AND LAVATORY ASSEMBLIES, INSTALLATIONS ON THE MAIN DECK. IN ADDITION INSTALLED RADAR AND COMMUNICATION EQUIPMENT RACKS AND PANELS


October, 1987 -  September, 1988

PIPER AIRCRAFT VERO BEACH , FL .

STRUCTURAL
DESIGNER/DRAFTER - INCLUDED THE DESIGN OF FUSELAGE BRACKET'S
AND COMPONENTS, NOSE COWLING FARING, COMPLETE ENGINE BAFFLE, FRONT LANDING
GEAR AND INSTRUMENT PANEL MODIFICATIONS. INSTALLED AVIONIC SUPPORT
ASSEMBLIES. WORKED WITH FLIGHT TEST AND EXPERIMENTAL ENGINEERING FOR THE PROTOTYPE MALIBU TURBO 350 AIRCRAFT.


August, 1985 -  July, 1987

GULF STREAM AEROSPACE SAVANNAH , GA .

INTERIOR DESIGNER - POSITION REQUIRED THE DESIGN OF BULKHEAD ASSEMBLIES
CABINET ASSEMBLIES, ENTERTAINMENT CABINET, DIVAN AND CHAIR INSTALLATIONS, DADO
PANEL, TABLE ASSEMBLIES AND INSTALLATIONS. ALL ASSEMBLIES INCLUDED
INSTALLATION PACKAGES WITH ALL ASSOCIATED PIECE PARTS. DRAWINGS WERE PER CUSTOMER REQUEST and DESIGN CONCEPT DRAWINGS. WORKED FOR LAST 3 PRODUCTION SERIES OF GULF STREAM III, REASSIGNED TO NEW GULF STREAM IV, JOB DESCRIPTION SAME AS ABOVE.


MAY, 1984 -  March, 1985
MECHANICAL DESIGNER

AEROSPACE ELECTRONICS OF MOTOROLA GOVERNMENT ELECTRONICS


January, 1983 -  February, 1984
MECHANICAL DESIGNER or

SPERRY AVIONICS DIVISION GLENDALE , AZ .


April, 1982 -  November, 1982

LOCKHEED AIR SERVICE ONTARIO . CA .


August, 1981 -  April, 1982

LITTON DATA SYSTEMS NEW ORLEANS , LA .


August, 1980 -  August, 1981

MOTOROLA SEMI-CONDUCTOR DIVISION MESA , AZ .


1980 -  August, 1980
ELECTRO/MECHANICAL DESIGNER

MOTOROLA AZ . GOVERNMENT ELECTRONICS DIVISION TEMPE MOTOROLA SEMI-CONDUCTOR DIVISION MESA , AZ .




Miscellaneous

ADDITIONAL JOB DESCRIPTIONS and REFERENCES FURNISHED UPON
REQUEST*
THANK YOU-